×

US 41/Country Meadows intersection construction complete | Records | ehextra.com

npressfetimg-1003.png

US 41/Country Meadows intersection construction complete | Records | ehextra.com

Intersection work full

Inexperienced BAY—The Wisconsin Division of Transportation (WisDOT) Northeast Area introduced completion of enchancment On the U.S. 41 and Nation Meadows intersection simply west of Marinette. The $166,000 enterprise started Sept. 20 and fulld on time and on price range.

Construction included eradicating the median pavement crossing and left flip lanes, placing in a raised median, storm sewer drains and concrete curb. The intersection is now restricted to proper-in/proper-out fliping actions solely. The enterprise provides a safer intersection for the touring public alongside U.S. 41 And fullly different people who use the Nation Meadows intersection by eliminating The potential of left-flip crashes.

Peters Concrete Agency of Green Bay was the prime contractor. Upgrades to the railroad crossing on Nation Meadows Road have been carried out by the railroad proprietor.