×

What road construction projects are happening near you? Here’s the list

npressfetimg-763.png

What road construction projects are happening near you? Here’s the list

North Dakota’s road enchancment season starts in spring and runs by way of fall. Simply As a Outcome of the temperatures go up and the snow melts away, the orange cones go down and enchancment zone indicators seem.

Crews On The metropolis and state levels are working to wrap up their work Throughout the state earlier than the snow returns and temperatures drop into the 30s and decrease.

What work is being carried out in your space? You will Have The power To hint the tasks by way of particular metropolis internet web websites As properly as to the North Dakota Division of Transportation internet website. Additionally, many cities ship out e-mail information releases on short-term road closures as enchancment work progresses — You can be added to these e-mail lists by way of The metropolis’s internet website.

Listed right here are some useful hyperlinks:

North Dakota Division of Transportation Road Projects: 

https://www.dot.nd.gov/tasks/

Bismarck Road Projects: 

https://www.bismarcknd.gov/1498/Bismarck-Streets

Mandan Road Projects: 

https://mandannd.govoffice.com/roadtasks?&pri=0

Minot Road Projects 

https://www.minotnd.org/436/Construction-and-Projects

Dickinson Road Projects: 

https://www.dot.nd.gov/tasks/dickinson/

Williston Road Projects: 

https://www.metropolisofwilliston.com/information_detail_T18_R783.php

______________________________________________

Current Widespread Construction Updates:

Bismarck: Starting 12:00 PM, Sunday, September 25, 2022, Forty third Avenue North between Level Loop and Hay Creek Drive Shall be closed to by way of visitors.  Forty third Avenue NE Shall be opened between Level Loop the roundabout at Forty third Avenue and Nineteenth Street on The mannequin new pavement.  Twenty sixth Street Shall be closed between Forty third Avenue and Seneca Drive. The contractor Shall start The enchancment of The mannequin new roundabout On the intersection of Twenty sixth Street and Forty third Avenue. 

Entry to The Levele and the River of Hope facility Shall be primarytained from Nineteenth Street north of Forty third Avenue.  Entry to the Schilling constructing Shall be primarytained from State Street.

The detour route for the closure Shall be State Street to Century Avenue to Centennial Road.  Entry to companies aprolongedside Forty third Ave North Shall be primarytained.

The closure is anticipated to be in place by way of October.

Mandan: Crews started reconstructing the Mandan Union Cemetery Road on Thursday, Sept. 22. The cemetery will stay open and accessible all by way of enchancment. When detour indicators are up, visitors Shall be directed to the far north entrance.

This enterprise consists of enchancment of a concrete paved road from Mandan Ave to the cemetery entrance gate, snow website entrances, And a few chip seal and patch work on roads Contained in the cemetery.

The City anticipates the reconstruct portion of the enterprise to be full prior to snowfall, with chip seal work deliberate to Happen by way of June 2023.

Minot: A quick lived visitors bypass Shall be positioned on 4th Avenue NE for eastbound and westbound visitors starting Monday, September 26. The bypass will take visitors south Of The current road onto a short-term roadway for a brief stretch earlier than returning to The distinctive roadway. The bypass Is predicted to be in place by way of October Third. The touring public Ought to be ready for short-term delays and use warning wright hereas navigating this stretch of road.

Starting October Third, 4th Avenue NE Shall be closed to eastbound and westbound by way of visitors starting at Seventh Street NE to 2Seventh Street NE. Traffic administration will route by way of visitors to Burdick Expressway to bypass this space. Entry to Lowe’s Backyard Center Shall be off 2Seventh Street SE. This closure Is predicted to be in place by way of November 2022.

The work on 4th Avenue NE is An factor of the Half MI-5 Northeast Tieback Levee Project, a Mouse River Enhanced Flood Safety Project phase. Half MI-5 consists of earthen levees, arterial road modifications, a dry stormwater pond, floodwalls, a metropolis greenway function, and a stormwater pump station. When fulld and related to The primary 4 phases of the MREFPP, the MI-5 phase will assist take away roughly 60 % of Minot residents from the proposed FEMA floodplain and, Most significantly, current prolonged-time period flood protection to the doc flood of 2011. All of the improved flood protection tasks presently beneath enchancment And fullly different people beneath design current a diploma of protection equal to the 2011 flood, plus three ft of freeboard.

For extra particulars on the enterprise and The latest information, go to www.mouseriverplan.com or search on Fb and Simply like the enterprise information Website.